Overview

This guide will provide a step by step walk-through of creating a Microblaze based hardware design using the Vivado IP Integrator for the Basys 3 FPGA board.

At the end of this tutorial you will have:

  • Created a Microblaze based hardware ( HW ) design in Xilinx Vivado
  • Created a .C Project in Xilinx Vivado SDK ( Software Development Kit) to display Hello World using the hardware design shown in the previous step
  • Displayed the final output on both the SDK console and Tera Term

Prerequisites

Hardware

  • Digilent Basys 3 FPGA Board and Micro USB Cable for UART communication and JTAG programming

Software

  • Xilinx Vivado 2016.X with the SDK package.

Board Support Files

  • Board Support Files

—–

Tutorial

Microblaze is a soft IP core from Xilinx that will implement a microprocessor entirely within the Xilinx FPGA general purpose memory and logic fabric. For this tutorial, we are going to add a Microblaze IP block using the Vivado IP Integrator tool.

In addition to the Microblaze IP block, a UART ( universal asynchronous receiver/transmitter ) IP block will be added to communicate between the host PC and the soft processor core running on the Basys 3.

General Design Flow

I. Vivado

  • Open Vivado and select Basys 3 board
  • Create an new Vivado Project
  • Create empty block design workspace inside the new project
  • Add required IP blocks using the IP integrator tool and build Hardware Design
  • Validate and save block design
  • Create HDL system wrapper
  • Run design Synthesis and Implementation
  • Generate Bit File
  • Export Hardware Design including the generated bit stream file to SDK tool
  • Launch SDK

Now the Hardware design is exported to the SDK tool. The Vivado to SDK hand-off is done internally through Vivado. We will use SDK to create a Software application that will use the customized board interface data and FPGA hardware configuration by importing the hardware design information from Vivado.

II. SDK

  • Create new application project and select default Hello World template
  • Program FPGA
  • Run configuration by selecting the correct UART COM Port and Baud Rate

1. Creating a New Project

When you first run Vivado this will be the main start window where you can create a new project or open a recent one.

1.1) Click on Create New Project. Choose the Project Name and Location such that there are no blank spaces. This is an important naming convention to follow for project names, file names and location paths. Underscore is a good substitute for empty spaces. It is good practice to have a dedicated folder for Vivado Projects, preferably with the smallest possible path length. Example: C:/Vivado_Projects. Name your Project and select the Project location and click Next.


1.2) Choose Project Type as RTL Project. Leave the Do not specify sources box unchecked and click Next.

1.3) If you have followed the Board Support File Wiki guide then click next until you can select Boards. From the filter options make required selections for Vendor, Display Name and Board Revision. Basys 3 should be displayed in the selection list. A mismatch in selecting the correct board name will cause errors. Choose Basys 3 and click next.

1.4) A summary of the new project design sources and target device is displayed. Click Finish.


2. Creating New Block Design

2.1) This is the main project window where you can create a IP based block design or add RTL based design sources. The flow navigator panel on the left provides multiple options on how to create a hardware design, perform simulation, run synthesis and implementation and generate a bit file. You can also program the board directly from Vivado with the generated bit file for an RTL project using the Hardware Manager. For our design, we will use the IP Integrator to create a new block design.

2.2) On the left you should see the Flow Navigator. Select Create Block Design under the IP Integrator. Give a name to your design without any empty spaces.

2.3) An empty design workspace is created where you can add IP blocks. Add an IP core by clicking on the Add IP icon. This should open a catalog of pre-built IP blocks from Xilinx IP repository.


3. Adding the clock

3.1) Click the Board tab

This list contains all of the components defined in the board file you installed before. These are already configured to work with several Vivado IPs.
3.2) Click and drag the System Clock component onto the empty block design. Vivado will automatically connect this system clock to a new Clocking Wizard block.

3.3) Double click the Clocking Wizard block to customize it. Click on the Output Clocks tab and confirm clk_out1 to “100.000”. Make sure the Reset Type to Active high


4. Adding Microblaze IP and Customization

4.1) Add an IP core by clicking on the Add IP icon. Search for “Microblaze” and double click on it to add the IP block to your design. This is the Xilinx Microblaze IP block. When a new IP block is added the user can customize the block properties by either clicking on the Run Block Automation message prompt or by double clicking on the block itself.

4.2) Select Run Block Automation and a customization assistant window will open with default settings.

4.3) Change default settings in the block options as shown below and click OK. This will customize the block with our new user settings.

4.4) Running the block automation will auto-generate a set of additional IP blocks which will be added to our hardware design automatically based on the options selected in the previous step. Do not click on Run Connection Automation yet.


5. Adding Peripheral Components

5.1) Go into the Boards tab again and find the USB UART component. Click and drag this onto the block design to add the Uartlite block to your design.

:
5.2) Click Run Connection Automation in the green banner. Check the All Automation checkbox OK.

5.3) Click Run Connection Automation again in the green banner. Check the All Automation checkbox OK.

5.4) Click the Regenerate Layout button to rearrange your block design.

5.5) Select Validate Design. This will check for design and connection errors. There will be an error with the reset of the clock wizard and the rst_clk_wiz.

5.6) Select messages and look at only the Errors. Click on the second blue link and change from active low to activ high in the box above the messages console.

>5.7) Add an IP core by clicking on the Add IP icon. Search for “Processor System Reset” and double click on it to add the IP block to your design.


5.8)